Upcoming Awarded Project · Planned start: November 15, 2026
Pro Access Floors has been awarded a turnkey 6,000-square-foot raised flooring installation for an expansion at Hilton Santa Fe Buffalo Thunder in Santa Fe, New Mexico. Work is planned to begin November 15, 2026.
The specified Tate CCN 2500 concrete raised floor system will use a bolted stringer understructure at a 12-inch finished floor height. HPL-finished panels are specified with carpet installation planned over the panel surface.
Buffalo Thunder: Awarded Expansion Specifications
- Status: Upcoming awarded project
- Location: Santa Fe, New Mexico
- Planned start: November 15, 2026
- Scope: Approximately 6,000-square-foot expansion
- Floor system: Tate CCN 2500 concrete system
- Understructure: Bolted stringer system
- Finished floor height: 12 inches
- Panel finish: HPL
- Planned floor covering: Carpet over the HPL-finished panels
- Pro Access Floors scope: Turnkey installation
Hilton Santa Fe Buffalo Thunder Property Photos
These photos show the existing resort exterior and casino interior. They provide property context and do not document the upcoming expansion or its raised flooring installation. Click a photo to view a larger image.


Hilton Santa Fe Buffalo Thunder exterior overlooking the pond at sunset.


Existing Buffalo Thunder casino interior with gaming tables and slot machines.
Tate CCN 2500 Concrete Raised Floor Systems
The awarded expansion specifies a Tate CCN 2500 concrete raised floor system with bolted stringers. The panels and supporting assembly will form the approximately 6,000-square-foot raised flooring scope at a 12-inch finished floor height.
HPL-Finished Panels for Carpet Installation
The panel specification calls for HPL-finished panels with carpet planned over the surface. The HPL panel finish and the planned carpet covering are separate parts of the flooring configuration.
Turnkey Raised Flooring Installation for the Expansion
Pro Access Floors will complete the turnkey raised flooring installation for the Buffalo Thunder expansion. The upcoming work will incorporate the specified Tate CCN 2500 system, bolted stringer understructure, and 12-inch finished floor elevation, with a planned start of November 15, 2026.
Discuss Your Raised Flooring Project
Planning a casino expansion or another commercial raised flooring project? Contact Pro Access Floors with your location, approximate square footage, panel requirements, understructure, finished floor height, planned covering, and schedule.